Realisations in engineering

Accomplishments

  • Preparation of the grant application for the Airports Capital Aid Program from Transport Canada (ACAP).
  • Preparation of the drawings and specifications for tender.
  • Management and supervision of on-site work.

Project

  • Replacement of runway, taxiway and tarmac lighting.
  • Replacement of wind socks.
  • Replacement of regulators and traffic signs.
  • Installation of runway guard lights

Accomplishments

  • Preparation of the grant application for the Airports Capital Aid Program from Transport Canada (ACAP).
  • Preparation of drawings and specifications for tender.
  • Management and supervision of on-site work.

Project

  • Replacement of the aerodrome substation’s building (FEC).
  • Replacement of the 4.2 kV electrical distribution with a 600 V distribution for the airport’s regular and emergency distribution and that of other buildings surrounding the airport.
  • Replacement of the generator for runway lighting.
  • Replacement of the runway control system with a touch screen system.
  • Replacement of runway lighting regulators.

Turnkey project, realized with Barrette et Fils ltée

Accomplishments

  • Complete the drawings and specifications for construction that included the following installation work:
    • lighting of the runway and taxiways;
    • two PAPI systems;
    • two ODALS systems;
    • traffic signs;
    • the aerodrome’s substation (FEC) including runway lighting regulators;
    • lighting of tarmacs by floodlighting.

Accomplishments

  • Preparation of drawings and specifications for tender.

Project

  • Installation of runway edge lights on two runways.
  • Installation of edge lights and center line’s lights on taxiways.
  • Installation of four PAPI systems, runway centerline lights and touchdown area lighting on two runways, two CAT II approach systems and two CAT III approach systems, runway guard lights and traffic signs as well as remaining distance panels on a runway.

Accomplishments

  • Preparation of drawings and specifications for tender.
  • Project management and on-site supervision of electrical work.

Project

  • Replacement of runway lights and installation of new lights on the runway extension.
  • Installation of an ODALS system, a SSALR system, traffic signs, some new regulators and a generator.

Accomplishments

  • Preparation of the grant application for the Airports Capital Aid Program from Transport Canada (ACAP).
  • Preparation of drawings and specifications for tender.
  • Management and supervision of on-site work.

Project

  • Rehabilitation of the runway.
  • Replacement of the lighting on the runway and taxiway.
  • Installation of two PAPI systems and two wind socks.

Accomplishments

  • Preparation of the grant application for the Airports Capital Aid Program from Transport Canada (ACAP).
  • Preparation of drawings and specifications for tender.
  • Management and supervision of on-site work.

Project

  • Rehabilitation of the runway.
  • Replacement of the lighting on the runway and taxiway.
  • Replacement of two wind socks.

Accomplishments

  • Preparation of the grant application for the Airports Capital Aid Program from Transport Canada (ACAP).
  • Preparation of drawings and specifications for tender.
  • Management and supervision of on-site work.

Project

  • Replacement of the 4.2 kV electrical distribution with a 600 V distribution for the terminal’s regular and emergency distribution.
  • Replacement of the generator and runway lighting regulators.

Accomplishments

  • Preparation of drawings and specifications for tender.
  • Management and part-time supervision.

Project

  • Replacement of a control switch panel with a touch screen control panel.