Realisations in Electrical Construction

Accomplishments

  • Fire alarm system.
  • Lighting.
  • Main 600A-600V electrical installation
  • Auxiliary 400A-600V electrical installation.

Project

  • Rehabilitation of an old warehouse converted into a hangar for aircraft repairs.

Accomplishments

  • Installation of cable trays.
  • Installation of the HiBay lighting.

Travaux réalisés

  • Fournir la main-d’oeuvre, les matériaux et l’équipement pour la construction d’un nouveau bâtiment de service au poste de lacentrale Péribonka.
  • Un réseau de distribution à 600 V, 3 phases, 3 fils pour les forcemotrices, le chauffage et autres.
  • Un réseau de distribution à 120/208 V, 3 phases, 4 fils pourl’éclairage, le chauffage, certaines charges motrices, les prises de courant et les services.
  • Un système d’alarme incendie.
  • Installation du système de sécurisation du bâtiment de service.
  • Des systèmes d’éclairage intérieurs et leurs contrôles.
  • Des systèmes d’éclairage extérieurs et photocellules.
  • Les raccordements à l’alimentation de tout l’équipement deplomberie, de chauffage, de ventilation et de climatisation.
  • Un réseau de conduits complet avec boîtes pour le téléphone et l’informatique.
  • Un système d’éclairage d’urgence avec unité à batteries.
  • Un système de câbles chauffants pour les portes de garage, les évents et le drain de toit.
  • Un système de mise à la terre, incluant les raccordements à la grille de MALT du poste.
  • Un système de détection de gaz complet avec détecteurs et alarmes.
  • Un système de contrôle d’accès.

Accomplishments

  • Electrical work for the new inn.
  • Upgrade of the dam’s gate leafs and lighting.

Accomplishments

  • Electrical and grounding work for the 315 kV terminal station.
  • Electrical work in the laundry room.

Accomplishments

  • Installation of a 125 KW, 347/600 V generator.
  • Installation of cable trays
  • Fire alarm system.
  • Intrusion alarm system.
  • Electrical distribution.
  • Automation, control and programming.

Accomplishments

  • Electrical work of a new aircraft hangar and administrative offices.

Accomplishments

  • Aluminothermy welding
  • Compressed joints
  • Grounding of the new buildings :
    • Concentrator.
    • Generator building.
    • Building for 400-ton trucks.

Accomplishments

  • Electrical work in the infirmary.
  • Main power station.
  • Installation of fire alarm systems in several areas of the plant in collaboration with Honeywell.
  • Electrical work of the jobsite warehouse.
  • 315 kV terminal station;
  • Plant’s ground grid;
  • Grounding work for various departments.

Accomplishments

  • Fire alarm system and intrusion alarm system.
  • Distribution.
  • Lighting.
  • Heating.
  • Access control.
  • Camera surveillance.
  • Computer and telephone system.

Accomplishments

  • Installation of the substation’s security system.

Accomplishments

  • – Installation of the substation’s security system.

Accomplishments

  • Installation of the power station’s security system.

Accomplishments

  • Modernization of the drinking water plant.
  • Various electrical work.

Accomplishments

  • Rehabilitation of the Deception Bay platform.
  • Installation of 3 35-foot lighting poles.
  • Electrical wiring.
  • work.
  • Communication cable ducts.